Working With a Design-Build Partner
What to expect from an energy and facilities project, from the first audit to the years after the equipment is running. This page demonstrates the Chapters layout with a plain sticky index.
- Why a design-build partner
- How an energy audit works
- Funding the project
- What happens after installation
Why a design-build partner
With design-build, one firm carries your project from the first survey to the final test, so you have one contract, one point of contact and one party responsible for the result. When the engineer who sized the equipment is also the one who installs it, there is no gap for problems to fall into.
Your staff keep their time for their own work. You see one schedule and one budget, and when a question comes up on site it is answered by the people who made the design decision rather than passed between a designer and a separate contractor.
The approach suits school districts and cities because it fits the way public bodies buy. The scope, the price and the guaranteed savings are set before the board votes, and the firm is accountable to that number afterward.
How an energy audit works
An energy audit tells you where your buildings use energy, which systems waste it and what it would cost to fix each one. Our engineers walk every campus, read the utility bills for the past few years and log the age and condition of the mechanical, lighting and control equipment.
The result is a plain report that ranks the measures by payback, so you can see which upgrades pay for themselves fastest and which ones are worth doing for comfort or reliability even when the savings are smaller.
Funding the project
Most of the work we do is paid for by the energy it saves. Under a performance contract the yearly savings cover the loan payments, and the savings are guaranteed in writing, so your general fund is not asked to carry the cost of new equipment.
Texas offers low-interest loans to public bodies for exactly this kind of project, and many districts combine that money with bond funds or maintenance budgets already set aside. We help you line up the sources and prepare the paperwork your board and the lender will ask for.
You see the full cost, the expected savings and the term of the financing before you sign anything, in a form your business office can check against its own numbers.
What happens after installation
Installation is the middle of the project, not the end. Every system is tested against its design, your maintenance staff are trained on the new equipment and controls, and you receive the manuals, drawings and test records as one set.
For the length of the guarantee we measure the savings against the utility bills each year and report them to you. If a system drifts, we find out from the data before you find out from a complaint.
The project is finished when the savings show up on the bill, not when the crane leaves the parking lot.