You have buildings to keep running, budgets to manage, and a community counting on you. When it’s time to make improvements, you need to understand your options, what the work involves, and who will be responsible.
Six questions clients ask us
Before You Commit to a Project
Get to know how E3 approaches your project, the people involved, and what the process means for your team.
Each answer below describes how the work runs, next to an example from a Texas client project you can read for yourself.
Question 01
Will you understand what we need?
Before we propose anything, we assess your buildings. That means looking at the condition and remaining life of the systems you have, how they are controlled, what your utility data shows, and the problems your staff work around every day.
We also need to understand your side of it: which buildings matter most, what your budget and funding timeline look like, and which problems cannot wait. The assessment becomes the basis for a scope you can take to your board.
In practice

Working with the team has been great. They are professional and always come up with the right solutions to our problems.
Stephen Mayfield, City Manager, City of Stockdale

E3 did everything they said they would. The audit was very thorough and the team walked us through every step and each recommendation.
Dr. James Largent, Superintendent, Granbury ISD
Question 02
Will we understand our options?
Our recommendations come in plain terms: what each improvement involves, what it costs, what it fixes, and what it means to wait. When there is more than one reasonable way to solve a problem, we lay out the alternatives and the tradeoffs so your team and your board can decide.
Funding is part of the same conversation. Depending on the project, that can mean bond proceeds, fund balance, SECO LoanSTAR loans, or cooperative purchasing contracts. We explain which paths fit your situation and what each one requires. See funding options
In practice
Question 03
Who is responsible for the work?
E3 is a design-build firm, so one contract covers both the engineering and the construction. The engineers who design your project and the construction team that builds it answer to the same project leadership, with one schedule and one budget.
That matters most when something unexpected turns up. If conditions in the field do not match the drawings, the people who designed the system and the people installing it work it out together, and you are not left refereeing between an engineer and a contractor. You have one point of accountability for questions and issues from the first assessment through closeout. Meet our team
In practice

Donna ISD · 20 campuses
0
change orders on a $7.9M program: LED lighting at 20 campuses, building automation at 6, HVAC at 9

E3’s phased mechanical upgrades were executed with minimal disruption to our classrooms.
Tom Woody, Superintendent, Boyd ISD
Question 04
How will this affect our daily operations?
We build the construction schedule around the people using your buildings. For schools, the most disruptive work, like equipment replacements and crane lifts, usually happens in summer. Other work is done after hours or in phases so most of a building stays in use.
We work out the phasing with your staff before construction starts, so you know which areas will be affected and when.
In practice
Question 05
What happens when construction is complete?
What is included at closeout is written into each project’s scope, so you know before construction starts. Depending on the project, it can include:
- Commissioning, testing and balancing to confirm systems run as designed
- On-site training for your maintenance staff
- Documentation of equipment and control system programming
- Warranty information for installed equipment
- Measurement and verification when energy savings are guaranteed
Many clients come back for later phases. At Ferris ISD, observations from completed work are shaping the scope of the next phase.
In practice

Granbury ISD · Year 1
$323,362
in verified energy savings, $41,500 more than the guaranteed target
Question 06
Have you helped an organization like ours?
The best way to judge our work is to look at what we have done for organizations like yours. Start with Port Neches-Groves ISD, where E3 delivered a nearly $12 million program of chillers, LED and sports lighting, and building automation, funded through the Cool Chillers Program and SECO LoanSTAR.
I’ve been in the school district for 15 years…and this project was probably the best run project I’ve been a part of.
Mike Gonzales, Superintendent, Port Neches-Groves ISD
Find a Project Like Yours

Goodall-Witcher Healthcare
Healthcare. LED lighting, targeted HVAC replacements and a new building automation system for a community hospital and clinic in Clifton.

Houston Community College
Higher education. A campus-wide LED retrofit installed in three weeks and financed through SECO LoanSTAR at a 1% fixed rate.

City of Stockdale
Municipal. Wastewater lagoons restored without mechanical dredging, returning capacity the city needs for future development.
Our background
Experience That Informs Your Project
Since 2009, E3 has worked with Texas school districts, hospitals, colleges, cities and counties, and our leadership team has worked in energy management since the 1980s. Texas is still where all of our work happens, from offices in Highland Village, Houston and Boerne.
For you, that history shows up in practical ways: familiarity with Texas procurement rules and cooperative contracts, experience with state funding programs like SECO LoanSTAR, and a long record of retrofitting buildings that had to stay open while the work was done.
The Texas Association of School Boards (TASB) selected E3 as its preferred provider for energy efficiency audits and school facility upgrades.
You’ll never hear us say, “it’s not our problem.”
Don Meek, E3 Founder
2009
when E3 began partnering with Texas public entities
1980s
when our leadership began working in energy management
400+
public entities served
375+