Client Story
Goodall Witcher Hospital
LED retrofits, targeted HVAC replacements and a new building automation system across a hospital campus in Clifton.
$3,443,809
Total contract
LED, HVAC and controls
Scope
The Project
E3 partnered with Goodall-Witcher Healthcare in Clifton, TX, on a facility-wide energy efficiency upgrade involving advanced LED lighting retrofits, targeted HVAC replacements, and the installation of a modern Building Automation System (BAS). The project was designed to improve occupant comfort, enhance clinical reliability, and reduce long-term energy costs.
Watch the Goodall Witcher Hospital case study video to learn about the district’s mechanical modernization, HVAC improvements, and LED lighting retrofits.
LED Lighting Retrofit
- E3 retrofitted over 1,900 fixtures across three facilities:
- Hospital, Clinic, and Laundry
- Nursing Facility
- Fitness and Wellness Center
Lighting scope included:
- Replacement of outdated T8 and CFL fixtures with high-efficiency LED lamps and recessed retrofit kits
- Exterior lighting upgrades for safety and visibility
- Installation of dimmable LED fixtures and controls in all patient and tenant rooms
- Warranty coverage up to 10 years on key components
HVAC System Upgrades
Targeted HVAC improvements to critical areas included:
- Replacement of 14 fan coil units serving patient rooms
- Replacement of 2 HVAC units serving operating rooms
- Replacement of 1 delivery room unit
- Installation of 11 clinic RTUs and 2 cardio lab RTUs
- Restoration of chilled/hot water operation to 2 rooftop AHUs damaged in the 2021 freeze
Building Automation System (BAS)
E3 deployed a new direct digital controls (DDC) system across the hospital, integrating:
- Chillers and boilers
- Air handlers and fan coil units
- VAVs, rooftop units, and exhaust fans
- Space temperature monitoring and flow verification
Goodall Witcher Hospital Project Photos
Completed Improvements and Retrofits










































Additional Project Photos











Installation and Construction Progress















































































































































More Central Texas Stories

Manor ISD
A $10.2M bond-funded program of energy conservation and deferred maintenance upgrades across the district.

Boyd ISD
A $3.2M design-build HVAC replacement and controls program across the district’s campuses.

Bryan ISD
More than $24M in phased improvements across 24 district facilities, from LED lighting to air handling replacements.