Client Story

Boyd ISD

A $3.2M design-build HVAC replacement and controls program across the district’s campuses.

$3,156,127

Total contract

HVAC and controls

Scope

Design-Build

Contract type

2024

Completed

Districtwide HVAC and Controls Upgrades

Boyd ISD selected E3 Entegral Solutions as its design-build partner for a comprehensive HVAC replacement program across all district campuses. Following a competitive qualifications-based selection process, E3 was awarded a $3,156,127 contract to address aging mechanical equipment and improve energy efficiency throughout the district’s facilities.

This video highlights the energy efficiency improvements and facility upgrades implemented across the district. Watch the case study to see the impact of single-source accountability.

E3 conducted a complete facilities assessment across Boyd ISD’s five campuses: Boyd Elementary, Boyd Intermediate, Boyd Middle School, Boyd High School, and district auxiliary facilities, evaluating equipment condition, life-cycle status, and energy management opportunities. The resulting design-build scope was developed to minimize academic disruption while delivering long-term operational savings to the district.

The Comprehensive Project Included:

  • Full HVAC life-cycle replacements districtwide
  • Districtwide energy management system evaluation and optimization
  • Turnkey engineering design and construction management
  • Commissioning of all installed systems
  • Performance management and MandV services

Project Video: HVAC Upgrades in Action

E3’s phased mechanical upgrades were executed with minimal disruption to our classrooms. The energy management system gives us total control over our energy use.

Tom Woody, Superintendent

Procurement and Funding

The project was funded through Bond 2024 proceeds and procured through a competitive qualifications-based selection process. E3’s selection was based on demonstrated qualifications, relevant Texas K-12 project experience, and depth of technical team consistent with the district’s commitment to responsible stewardship of public funds.

Project Facts

  • Funding: 2024 Bond

LED Sports Lighting and Auxiliary Upgrades

  • Scope: LED sports lighting and auditing.
  • Contract: $650,000 (estimated), ESPC.
  • Completed: 2025.

Following the success of the mechanical upgrades, Boyd ISD re-engaged E3 to install energy-efficient LED sports lighting at the high school football stadium, baseball field, and tennis courts. By switching to high-output, directional LED fixtures, the district dramatically improved spectator and player visibility while cutting athletic utility costs by 45%.

The new lighting not only improved visibility but dramatically reduced our utility bills. We realized our annual savings estimate in just over eight months of tracking.

Texas School District

Boyd ISD Project Photos

More Project Photos

Boyd ISD – Before Upgrades (Archive)

Boyd ISD – Completed Projects (Archive)

Boyd ISD – Construction Phase (Archive)

More Central Texas Stories

Bryan ISD project photo

Bryan ISD

More than $24M in phased improvements across 24 district facilities, from LED lighting to air handling replacements.

Caldwell ISD project photo

Caldwell ISD

A board-approved renovation of the HVAC and lighting systems at Caldwell High School.

Goodall Witcher Hospital project photo

Goodall Witcher Hospital

LED retrofits, targeted HVAC replacements and a new building automation system across a hospital campus in Clifton.

Let’s Talk About Your Campus.

Every district’s buildings are different. Tell us what is happening in yours, and we will help you find the best path forward.