Client Story
Bryan ISD
More than $24M in phased improvements across 24 district facilities, from LED lighting to air handling replacements.
$24M+
Total, two phases
$763,908
Annual savings, Phase I
LED, HVAC and controls
Scope
Design-Build
Contract type
The Project
Bryan ISD partnered with E3 to deliver a multi-phase facilities improvement program focused on energy efficiency, infrastructure modernization, and long-term operational savings. Following a comprehensive facility assessment, E3 developed and implemented solutions that improved building performance, occupant comfort, and system reliability across 24 district facilities.
This video documents E3’s partnership with Bryan ISD, highlighting over $6M in facility retrofits, HVAC enhancements, and LED lighting upgrades funded through the SECO LoanSTAR program.
Phase I: SECO LoanSTAR Project
Bryan ISD and E3 Entegral Solutions partnered to make over $6M in energy efficiency improvements at BISD’s facilities throughout 2020 and 2021. E3 was selected over eight other engineering firms to provide the required Utility Assessment Report to SECO for LoanSTAR funding, and E3 was later selected by BISD to provide the improvements on a design-build basis. Project details include:
- A comprehensive LED lighting retrofit, district-wide (24 facilities)
- Energy Management System optimization at 19 campuses
- Bipolar ionizer installation at 18 campuses and other ventilation adjustments
- Power conditioning improvements at 23 facilities
The SECO LoanSTAR program provides low-interest, fixed-rate loans to the public sector for energy efficiency projects. The interest rate for the Bryan ISD project was 2%, to be paid over the simple payback of the project.
Construction began in June 2020. E3 demonstrated its ability to construct in “occupied retrofit” mode at Bryan ISD: although the scope of work was expansive, E3 installed the project during the school year with no disruption to Bryan ISD’s educational mission.
Phase II: Bond Program
Building on the success of Phase I, Bryan ISD selected E3 to deliver Phase II through its 2020 Bond Program. Improvements included HVAC equipment replacements, outdoor air system upgrades, building automation enhancements, insulation improvements, VAV box replacements, ductwork modifications, and roof improvements. Major air handling unit replacements were completed while maintaining uninterrupted campus operations.
Together, the two phases delivered more than $24 million in facility improvements, modernizing critical infrastructure and positioning district facilities for long-term performance, reliability, and efficiency.
Project Facts
- Phase I: $6,421,852, completed 2021, funded by the SECO LoanSTAR Program.
- Phase II: $18.4 million, completed 2025, funded by the 2020 Bond Program.
Bryan ISD Project Photos
Installation and Construction Progress















































































Completed Improvements and Retrofits


















































































Additional Project Photos

.jpg_51479881896.jpg)
.jpg_51479101907.jpg)
.jpg_51480111963.jpg)
.jpg_51480604459.jpg)
.jpg_51480113608.jpg)













































More Central Texas Stories

Caldwell ISD
A board-approved renovation of the HVAC and lighting systems at Caldwell High School.

Goodall Witcher Hospital
LED retrofits, targeted HVAC replacements and a new building automation system across a hospital campus in Clifton.

Manor ISD
A $10.2M bond-funded program of energy conservation and deferred maintenance upgrades across the district.