Client Story
Edcouch-Elsa ISD
A $15.5M design-build HVAC retrofit of the North High School building.
$15,508,892
Total cost
HVAC and LED retrofit
Scope
Design-Build
Contract type
The Project
E3 delivered a $15,508,892 retrofit of the HVAC system at the North High School building on the Edcouch-Elsa High School campus. As the district’s design-build partner, E3 handled the engineering, the removal of old equipment, the installation of new systems, and the controls that tied it all together.
- Chilled water redesign: the high school chilled water system is redesigned from a 2-pipe to a 4-pipe system.
- Demolition and removal: existing air handlers, DX split systems, fan coil units, unit heaters and packaged rooftop units, plus the old hydronic piping and ductwork.
- New HVAC equipment: new air handlers, DX packaged rooftop units, an air-cooled chiller and a heating water boiler.
- Electrical upgrades: a new pad-mounted utility transformer, main switchboard and distribution panels.
- Building automation: a new Alerton BAS with DDC controllers, field devices and software, plus 3D animated graphics, on-site training and documentation of the system programming.
- Project size and phases: the retrofit covers 1,062,455 square feet. Phase I, completed in 2015, had a final construction cost of $6,943,436. Phase II, completed in 2025, had a final construction cost of $15,508,892.
Edcouch-Elsa ISD Project Photos












Before & After comparison


More South Texas Stories

Donna ISD
A $7.9M program with LED lighting at 20 campuses, building automation at 6, and mechanical retrofits at 9, completed with zero change orders.

Mercedes ISD
A district-wide program of new HVAC, lighting, energy management and water conservation, approved unanimously by the board.

Raymondville ISD
LED lighting, HVAC upgrades, air purification, stadium lighting and a roof replacement, delivered in phases.