Client Story
Bishop CISD
Eighteen new rooftop units at Luehrs Junior High and 5,212 LED fixtures across the district.
$1,036,716
Total program
$90,824
Guaranteed annual savings
RTUs and LED
Scope
Design-Build
Contract type
Luehrs Junior High and Badger Den Mechanical Upgrades
E3 designed and installed 18 high-efficiency packaged rooftop units (RTUs) with natural gas furnaces at the Luehrs Junior High campus. The scope of work also included providing new electrical service, structural support, routing and insulating condensate drain lines, and integrating existing controls.
In addition, E3 replaced two older RTUs on the Badger Den facilities, increasing cooling capacity from 5 to 6 tons to improve indoor climate control and ventilation, along with installing additional supply vents.
Installing the packaged RTUs resolved our cooling issues at Luehrs Junior High. E3 managed the helicopter lifts and electrical setup seamlessly.
Project Facts
- Scope: Packaged RTUs, Natural Gas, Electric Upgrades
- Contract amount: $1,036,716 (Total Program)
Districtwide LED Lighting Retrofits
E3 designed, supplied, and installed modern LED lamps and fixtures across all Bishop CISD buildings. Retrofitting a total of 5,212 interior and exterior fixtures resulted in improved lighting quality, lower heat output, reduced maintenance costs, and contractually guaranteed annual utility savings of $90,824.
The new lighting not only improved visibility but dramatically reduced our utility bills. We realized our annual savings estimate in just over eight months of tracking.
Project Facts
- Scope: 5,212 LED Fixtures, Energy Audit
At a Glance
- Location: Bishop, South Texas
- Contract type: Design-Build
- Project years: 2017
Bishop CISD Project Photos






























More South Texas Stories

Donna ISD
Two design-build programs totaling $34M: energy efficiency first, then HVAC modernization across 28 facilities.

Dr. M.L. Garza-Gonzalez Charter School
A facility project completed in March 2023.

Eagle Pass ISD
An energy savings performance contract projected to save $601,950 a year, followed by a $5M HVAC and controls project.