Client Story

Rio Hondo ISD

New chillers, air handlers, building automation and 4,480 LED fixtures, funded through ESSER and SECO.

$5,993,385

Total project value

LED, HVAC and controls

Scope

Design-Build

Contract type

2023

Completed

The Project

Rio Hondo ISD partnered with E3 Entegral Solutions on a Design-Build project to update lighting, HVAC and building automation across the District. The project was funded through ESSER and SECO. It aimed to improve energy efficiency, occupant comfort and system reliability at the High School, Elementary School and support facilities.

  • LED lighting: A districtwide LED retrofit replaced 4,480 fixtures, covering every campus except the Middle School, which already had LED lighting.
  • High School HVAC: Two new 300-ton chillers and replaced chilled water pumps, sixteen replaced rooftop air handling units (three converted to DX heat pumps), and 101 replaced VAV boxes.
  • Elementary School HVAC: Two new 200-ton chillers, eleven repaired air handling units (dampers and coils), and 68 replaced VAV boxes.
  • Building automation: An Automated Logic (ALC) system at both campuses schedules the chillers, air handling units, VAV boxes and exhaust fans, and monitors and controls space temperature and humidity.
  • Network-based thermostats: Added at the Old Junior High School and the Maintenance/Transportation facility.
  • Retro-commissioning: The existing control system at the new Middle School.
  • Building envelope: Improvements at the Elementary School, High School, Administration Office and Old Junior High School.

Project Facts

  • Funding: ESSER and SECO.

Rio Hondo ISD Project Photos

Installation and Construction Progress

Completed Improvements and Retrofits

Additional Project Photos

More South Texas Stories

Carrizo Springs CISD project photo

Carrizo Springs CISD

A $15M program to renew roofs, control moisture and modernize HVAC across the district.

Donna ISD project photo

Donna ISD

Two design-build programs totaling $34M: energy efficiency first, then HVAC modernization across 28 facilities.

Edcouch-Elsa ISD project photo

Edcouch-Elsa ISD

A $15.5M design-build HVAC retrofit of the North High School building.

Let’s Talk About Your Campus.

Every district’s buildings are different. Tell us what is happening in yours, and we will help you find the best path forward.