Client Story

Ricardo ISD

A $969,814 district-wide energy program with 44 new HVAC units, projected to save about $1M over 15 years.

$969,814

Total contract

$69,000

Annual savings

HVAC, lighting and controls

Scope

Design-Build

Contract type

The Project

Entegral Solutions completed a district-wide energy efficiency and conservation program at Ricardo Independent School District. The District utilized both ARRA SECO Cool Schools Grant funds and District General Fund to pay for the $969,814 project. The project is projected to save the school district approximately $69,000 annually and $1,000,000 during the next 15 years.

The comprehensive project includes:

  • Scope Overview: District-wide energy management control system, lighting and 44 new HVAC units
  • Elementary School: installed 14 new, Bard wall mount units and one York rooftop unit
  • Middle School: installed 18 new, Bard wall mount units
  • Technology School: installed two Bard wall mount units
  • Shared Facilities: The Cafeteria, Band Hall, Library, Gymnasium and Administration received 9 York roof top units

District-wide lighting upgrade included:

  • Lamp Replacement: T12 to T8 lamp replacement with electronic ballasts
  • System Re-lamping: Re-lamping existing with T8 25W lamps and electronic ballasts
  • High Bay: High bay lighting retrofits to T8 lamps and electronic ballasts
  • Fixture De-lamping: De-lamping existing fixtures – where appropriate
  • Motion Sensors: Occupancy sensors – where appropriate
  • Exit Signs: Installation of LED Exit signs
  • CFL Retrofit: Incandescent lights were retrofitted with Compact Fluorescent bulbs

District-wide controls upgrade included:

  • Network Thermostats: 63 wireless Proliphix Network Thermostats
  • Remote Sensors: 5 Remote sensors for temperature averaging

Ricardo ISD Project Photos

Installation and Construction Progress

Completed Improvements and Retrofits

Additional Project Photos

More South Texas Stories

Rio Hondo ISD project photo

Rio Hondo ISD

New chillers, air handlers, building automation and 4,480 LED fixtures, funded through ESSER and SECO.

Carrizo Springs CISD project photo

Carrizo Springs CISD

A $15M program to renew roofs, control moisture and modernize HVAC across the district.

Donna ISD project photo

Donna ISD

Two design-build programs totaling $34M: energy efficiency first, then HVAC modernization across 28 facilities.

Let’s Talk About Your Campus.

Every district’s buildings are different. Tell us what is happening in yours, and we will help you find the best path forward.