Client Story
Royal ISD
Seven new chillers, a redesigned plant, LED lighting and expanded building automation across the district.
$10,353,010
Final contract
Chillers, BAS and LED
Scope
Job Order Contract through TIPS
Contract type
July 2024
Completed
The Project
Royal ISD hired E3 to undertake a district-wide energy efficiency and facility upgrade project. Royal ISD was facing many of the same problems that other districts face; high energy bills, constant problems with their energy management controls, chillers malfunctioning and widespread comfort complaints. Together E3 and Royal ISD crafted a plan that addressed each of these issues while protecting the district’s M&O dollars.
Watch this video to learn about the comprehensive facility improvements, LED lighting, and mechanical upgrades completed at Royal ISD.
Project Facts
- Funding: Maintenance Tax Note and ESSER.
Energy Efficiency and Facility Upgrade
E3’s diagnostic phase informed a districtwide capital plan addressing chillers, RTUs, DOAS units, AHUs, building automation, LED lighting, and power protection. The overall energy efficiency and facility upgrade contract is valued at $10.45 million, of which Phase II accounts for $10,032,096.
The following projects were initiated to solve the issues:
- Chiller Installation: 7 new chillers throughout the district
- Plant Redesign: Chiller plant redesign and replacement
- Air Handling: RTU and DOAS redesign and replacement
- AHU Upgrade: AHU Replacement
- LED Retrofit: District-wide LED retrofit
- BAS Expansion: Installation and expansion of the Building Automation System
- Component Replacement: Replace control valves and dampers throughout the district
- Surge Protection: Surge Protection
- UPS Installation: Uninterruptible Power Supply (UPS) installation
Results
The result was dramatically reduced utility bills, fewer comfort complaints and maintenance calls, and a substantial reduction in the district’s deferred-maintenance backlog. Additionally, this project will result in rebate incentives from CenterPoint Energy.
Royal ISD Project Photos
Installation and Construction Progress















































































































Completed Improvements and Retrofits




Additional Project Photos









More South East Texas Stories

Houston Community College
A campus-wide LED retrofit finished ahead of schedule, with the entire installation done in three weeks.

Kountze ISD
A district-wide energy and facility program funded by a Qualified Zone Academy Bond and repaid with project savings.

Needville ISD
A four-phase energy-efficiency and conservation program paid for from the district’s fund balance.