Client Story

Royal ISD

Seven new chillers, a redesigned plant, LED lighting and expanded building automation across the district.

$10,353,010

Final contract

Chillers, BAS and LED

Scope

Job Order Contract through TIPS

Contract type

July 2024

Completed

The Project

Royal ISD hired E3 to undertake a district-wide energy efficiency and facility upgrade project. Royal ISD was facing many of the same problems that other districts face; high energy bills, constant problems with their energy management controls, chillers malfunctioning and widespread comfort complaints. Together E3 and Royal ISD crafted a plan that addressed each of these issues while protecting the district’s M&O dollars.

Watch this video to learn about the comprehensive facility improvements, LED lighting, and mechanical upgrades completed at Royal ISD.

Project Facts

  • Funding: Maintenance Tax Note and ESSER.

Energy Efficiency and Facility Upgrade

E3’s diagnostic phase informed a districtwide capital plan addressing chillers, RTUs, DOAS units, AHUs, building automation, LED lighting, and power protection. The overall energy efficiency and facility upgrade contract is valued at $10.45 million, of which Phase II accounts for $10,032,096.

The following projects were initiated to solve the issues:

  • Chiller Installation: 7 new chillers throughout the district
  • Plant Redesign: Chiller plant redesign and replacement
  • Air Handling: RTU and DOAS redesign and replacement
  • AHU Upgrade: AHU Replacement
  • LED Retrofit: District-wide LED retrofit
  • BAS Expansion: Installation and expansion of the Building Automation System
  • Component Replacement: Replace control valves and dampers throughout the district
  • Surge Protection: Surge Protection
  • UPS Installation: Uninterruptible Power Supply (UPS) installation

Results

The result was dramatically reduced utility bills, fewer comfort complaints and maintenance calls, and a substantial reduction in the district’s deferred-maintenance backlog. Additionally, this project will result in rebate incentives from CenterPoint Energy.

Royal ISD Project Photos

Installation and Construction Progress

Completed Improvements and Retrofits

Additional Project Photos

More South East Texas Stories

Houston Community College project photo

Houston Community College

A campus-wide LED retrofit finished ahead of schedule, with the entire installation done in three weeks.

Kountze ISD project photo

Kountze ISD

A district-wide energy and facility program funded by a Qualified Zone Academy Bond and repaid with project savings.

Needville ISD project photo

Needville ISD

A four-phase energy-efficiency and conservation program paid for from the district’s fund balance.

Let’s Talk About Your Campus.

Every district’s buildings are different. Tell us what is happening in yours, and we will help you find the best path forward.