Client Story
Glen Rose Medical Center
A design-build upgrade of chillers, air handlers, controls and lighting, planned to minimize disruption to patient care.
$3,914,460
Total contract
HVAC, controls and LED
Scope
Design-Build
Contract type
The Project
E3 partnered with Glen Rose Medical Center to deliver a comprehensive facility upgrade focused on energy efficiency, system reliability, and long-term operational savings. The fully engineered project was executed through a seamless design-build approach to minimize disruption to patient care while modernizing key infrastructure components.
This video case study features the critical infrastructure upgrades, HVAC plant replacements, and facility optimization works performed at Glen Rose Medical Center.
Lighting Improvements
- Retrofitted over 1,300 interior and exterior fixtures to LED technology
HVAC Upgrades
- Chillers:
Replaced (2) air-cooled chillers and associated chilled water pumps - Air Handlers:
Replaced (4) rooftop air handlers and refurbished (1) additional unit - DX rooftop air handlers:
Replaced (2) DX rooftop air handlers and (5) packaged rooftop HVAC units - VAV boxes:
Installed (21) VAV boxes serving Med-Surg patient areas - Boilers and Pumps:
Replaced (2) hot water boilers and associated hot water pumps - Water heaters:
Upgraded (2) domestic hot water heaters and pumps
Building Controls
- Complete conversion from pneumatic to direct digital controls (DDC) system
Electrical Improvements
- Upgraded one electrical panel to support new equipment
Results
- Significantly improved energy efficiency and reduced operational costs
- Enhanced patient comfort and indoor environmental quality
- Increased system reliability and ease of maintenance
Glen Rose Medical Center Project Photos
Installation and Construction Progress

























































































































































Completed Improvements and Retrofits



















Additional Project Photos








More North Texas Stories

Granbury ISD
More than 200 HVAC units replaced, including 160 placed by helicopter in a single day, plus water conservation and field turf.

Greenville ISD
A turn-key program of energy management, HVAC upgrades and lighting retrofits across the district.

Lake Worth ISD
A design-build program of 89 HVAC replacements, a new roof, LED lighting and centralized energy management.