A design-build upgrade of chillers, air handlers, controls and lighting, planned to minimize disruption to patient care.

$3,914,460

Total contract

HVAC, controls and LED

Scope

Design-Build

Contract type

The Project

E3 partnered with Glen Rose Medical Center to deliver a comprehensive facility upgrade focused on energy efficiency, system reliability, and long-term operational savings. The fully engineered project was executed through a seamless design-build approach to minimize disruption to patient care while modernizing key infrastructure components.

This video case study features the critical infrastructure upgrades, HVAC plant replacements, and facility optimization works performed at Glen Rose Medical Center.

Lighting Improvements

  • Retrofitted over 1,300 interior and exterior fixtures to LED technology

HVAC Upgrades

  • Chillers:
    Replaced (2) air-cooled chillers and associated chilled water pumps
  • Air Handlers:
    Replaced (4) rooftop air handlers and refurbished (1) additional unit
  • DX rooftop air handlers:
    Replaced (2) DX rooftop air handlers and (5) packaged rooftop HVAC units
  • VAV boxes:
    Installed (21) VAV boxes serving Med-Surg patient areas
  • Boilers and Pumps:
    Replaced (2) hot water boilers and associated hot water pumps
  • Water heaters:
    Upgraded (2) domestic hot water heaters and pumps

Building Controls

  • Complete conversion from pneumatic to direct digital controls (DDC) system

Electrical Improvements

  • Upgraded one electrical panel to support new equipment

Results

  • Significantly improved energy efficiency and reduced operational costs
  • Enhanced patient comfort and indoor environmental quality
  • Increased system reliability and ease of maintenance

Glen Rose Medical Center Project Photos

Installation and Construction Progress

Completed Improvements and Retrofits

Additional Project Photos

More North Texas Stories

Granbury ISD project photo

Granbury ISD

More than 200 HVAC units replaced, including 160 placed by helicopter in a single day, plus water conservation and field turf.

Greenville ISD project photo

Greenville ISD

A turn-key program of energy management, HVAC upgrades and lighting retrofits across the district.

Lake Worth ISD project photo

Lake Worth ISD

A design-build program of 89 HVAC replacements, a new roof, LED lighting and centralized energy management.

Let’s Talk About Your Facility.

Every facility is different. Tell us what is happening in yours, and we will help you find the best path forward.